DVWTP Finished Water Pump/Chemical Facility Rehab/Refurb - WS85100050, 56 & WS85263300


Solicitation Details

6000001151/WS85100050, 56 & WS85263300

Water Services

Julie Smith

10/19/2021 2:00 PM

11/05/2021 12:00 PM

912-00 - CONSTRUCTION SERVICES,GENERAL INC MAINTENANCE/REPAIR SERVICE


Additional Information

The City of Phoenix is seeking a qualified contractor to provide preconstruction services and complete construction services for the Deer Valley Water Treatment Plant (DVWTP) Finished Water Pump (FWP) and Chemical Facility Rehabilitation and Refurbishment Construction Manager at Risk (CMAR) project. The DVWTP Finished Water Pump Station and the associated facilities are nearing the end of their useful life. The selected CMAR will provide preconstruction services that include evaluating feasibility of a pump station rehabilitation and cost estimating. A site visit will be conducted. The following documents will be made available for viewing at the City offices during normal business hours for the duration of the advertisement period: Agency Review Drawings and Specifications dated January 2020, 90% Submittal Drawings and Specifications dated September 2020 and the FINAL Preliminary Design Report dated November 2020. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The estimated total cost for construction for this project is $30 million.


Associated Files


Firms must submit a Statement of Qualifications (SOQ) electronically through the ProcurePHX online portal at: https://eprocurement.phoenix.gov/irj/portal.
Firms must submit Title 34 Design-Bid-Build bid responses in person at 200 W. Washington Street, 5th Floor.

NOTE: The City of Phoenix will NOT accept responses submitted after the Date and Time stated in the Solicitation, nor will the City of Phoenix accept responses submitted by fax or e-mail.

PLEASE NOTE: If you download a Solicitation, you also need to download all current addenda that may have been issued since the original document was posted. It is the Bidder's responsibility to ensure that they have all addenda prior to submitting their offer.​