Updated: 03/07/2022 3:08 PM
6000001201/WS85508002
Water Services
01/25/2022 9:00 AM
02/04/2022 12:00 PM
Pending Council Approval
925-00 - ENGINEERING SERVICES,PROFESSIONAL
The City of Phoenix is seeking a qualified consultant team to provide engineering services for installation of approximately 30,000 feet of new 24-inch water transmission main from Cave Creek Road and Desert Peak Parkway and connecting to an existing 54-inch transmission main near Booster Station 5ED-B1. Services will include an alignment study, design, and possible construction administration and inspection services. The estimated construction cost is $15 million.