24-Inch Water Main: Cave Creek Road and Desert Peak Parkway to Booster Pump Station 5ED-B1 - WS85508002


Solicitation Details

6000001201/WS85508002

Water Services

Heather J Roye

01/25/2022 9:00 AM

02/04/2022 12:00 PM

Award Notice

925-00 - ENGINEERING SERVICES,PROFESSIONAL


Additional Information

The City of Phoenix is seeking a qualified consultant team to provide engineering services for installation of approximately 30,000 feet of new 24-inch water transmission main from Cave Creek Road and Desert Peak Parkway and connecting to an existing 54-inch transmission main near Booster Station 5ED-B1. Services will include an alignment study, design, and possible construction administration and inspection services. The estimated construction cost is $15 million.