Updated: 05/11/2022 3:24 PM
6000001246/WS90500305
Water Services
04/04/2022 3:00 PM
04/19/2022 2:00 PM
Pending Council Approval
912-00 - CONSTRUCTION SERVICES,GENERAL INC MAINTENANCE/REPAIR SERVICE
The City of Phoenix is seeking a qualified contractor to provide construction services for the project listed below. The proposed work includes installation of approximately 1,900 linear feet of new 15-inch sanitary sewer line just north of Van Buren Street from 50th Street to the Loop 202. The alignment begins at 50th Street near the Polk Street alignment, north on 50th Street to Taylor Street, east on Taylor Street to 51st Street, then south on 51st Street to Taylor Street, continuing east on Taylor Street, then south in an existing PUE along the west property line of parcel 125-05-029B to connect to the existing sewer just west of the Loop 202 and Polk Street alignment. The proposed 15-inch gravity sewer main will connect into the existing system and allow for removal or abandonment of some portions of the existing sewer lines. Work also includes installation of approximately 14 new sewer manholes. The Van Buren Relief sewer project (48th Street to Loop 202) will provide a new sewer that will mitigate surcharging flows experienced within the existing gravity sewer pipeline.
(pdf)
(pdf)
(pdf)
(pdf)
(pdf)
(pdf)