Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements


Solicitation Details

ST85100400

Street Transportation

Michael N Soto

04/05/2018 10:00 AM

05/01/2018 2:00 PM

Award Notice

912-00 - CONSTRUCTION SERVICES,GENERAL INC MAINTENANCE/REPAIR SERVICE


Additional Information

Pinnacle Peak Road: 45th Avenue to 35th Avenue project consists of constructing new roadway paving and storm drain improvements on Pinnacle Peak Road from 45th Avenue to just west of 35th Avenue, and constructing a new storm drain on 43rd Avenue extending north from Pinnacle Peak Road to Misty Willow Lane. The work includes: subgrade preparation and constructing new asphaltic concrete roadway pavement; new concrete curb and gutter, ADA compliant concrete sidewalk, curb returns, concrete driveway entrances; new concrete box culvert crossings, concrete wing walls, concrete headwalls with brick veneer facing, concrete channel lining, new storm drain mainline pipe, storm drain manholes, storm drain connector pipes and catch basins; trenching for underground street light circuits; installation of new traffic signal poles, signal equipment, and traffic signal conduits; installation of new LED street lights and LED luminaires; new landscaping and irrigation system, decomposed granite landscape ground cover; and other required work items. The Engineer’s Estimate is $6,739,153 to $8,236,741 A Small Business Enterprise goal of 15% has been established for this project.


Associated Files



Interested Parties

Contractor Information Contact