Scenario 3B Transmission Main Rehabilitation - Construction Manager at Risk - WS85507008


Solicitation Details

6000000768/WS85507008

Water Services

Julie Smith

09/09/2019 2:30 PM

09/27/2019 12:00 PM

912-00 - CONSTRUCTION SERVICES,GENERAL INC MAINTENANCE/REPAIR SERVICE


Additional Information

The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the Scenario 3B Transmission Main Rehabilitation project. The selected CMAR will work as a team with the design engineer and City staff to ensure an efficient design approach for the project. The main extends from Orangewood Ave and 20th St. to N. 20th St. and E. Shea Blvd. The estimated construction cost is $35.7 million.



Firms must submit a Statement of Qualifications (SOQ) electronically through the ProcurePHX online portal at: https://eprocurement.phoenix.gov/irj/portal.
Firms must submit Title 34 Design-Bid-Build bid responses in person at 200 W. Washington Street, 5th Floor.

NOTE: The City of Phoenix will NOT accept responses submitted after the Date and Time stated in the Solicitation, nor will the City of Phoenix accept responses submitted by fax or e-mail.

PLEASE NOTE: If you download a Solicitation, you also need to download all current addenda that may have been issued since the original document was posted. It is the Bidder's responsibility to ensure that they have all addenda prior to submitting their offer.​