Water Main Replacement ABB: Stanford Dr to McDonald Dr and 40th St to 44th St - Engineering Services - WS85509050


Solicitation Details

6000001034/WS85509050

Water Services

Heather Roye

11/23/2020 1:00 PM

12/11/2020 12:00 PM

925-00 - ENGINEERING SERVICES,PROFESSIONAL


Additional Information

The City of Phoenix is seeking a qualified consultant team to provide engineering services that include design and possible construction administration and inspection for replacement of water mains and related services. Work will include replacement of approximately 26,474 linear feet of 6 to 8-inch water main, 46 new fire hydrants, 18 cut and plugs, and 101 new valves. This project site is located within Quarter Section 20-37 bordered by Stanford Drive to McDonald Drive and 40th Street to 44th Street. The estimated total construction cost for this project is $5,1 Million.



Firms must submit a Statement of Qualifications (SOQ) electronically through the ProcurePHX online portal at: https://eprocurement.phoenix.gov/irj/portal.
Firms must submit Title 34 Design-Bid-Build bid responses in person at 200 W. Washington Street, 5th Floor.

NOTE: The City of Phoenix will NOT accept responses submitted after the Date and Time stated in the Solicitation, nor will the City of Phoenix accept responses submitted by fax or e-mail.

PLEASE NOTE: If you download a Solicitation, you also need to download all current addenda that may have been issued since the original document was posted. It is the Bidder's responsibility to ensure that they have all addenda prior to submitting their offer.​