Clickable Image

SR85 Water Systems Operation & Maintenance of Equipment


Solicitation Details

RFQ 26-SWDD-006

Public Works

Alexandro A Salazar

03/26/2025 9:00 AM

04/02/2025 11:00 AM

Tabulation

493-96 - Water Quality Monitoring Equip:BOD Analyzer,Turbidimeter,etc


Additional Information

The contractor will be required to manage and operate the water utility system include well sites and a reverse osmosis system at the SR 85 Landfill located in the City of Buckeye. This includes monitoring, sampling and reporting to maintain compliance with local, county, state and federal environmental regulations.